Getting the Outside Ready for the First Freeze
Hose bibs shut off and drained, hoses in, the AC condenser cleared and patio chairs stacked. Our mid-October list after last winter's split spigot.
Read more →
Hose bibs shut off and drained, hoses in, the AC condenser cleared and patio chairs stacked. Our mid-October list after last winter's split spigot.
Read more →
Four gallons of exterior paint on sale, two scrapers and a lot of 6 a.m. starts. Painting our 1952 garage ourselves for $298 instead of $2,200.
Read more →
Our backyard silver maple dropped seeds into every gutter this June. An arborist sized it up, quoted the pruning and told us what to watch.
Read more →
Two 4x8 cedar beds, a borrowed miter saw and $492 in lumber and soil. What we built, what we'd change and why Moose stays out.
Read more →
Our sump pump ran every few minutes in April. Two extensions and a yard and a half of topsoil later, water drains away from the back corner.
Read more →